Baseline Processing Options

Use these options to review baselines after processing, or to access the processing order, settings, or report. They are available in the Baseline Processing dialog, which you can sort by any column.

Options

Save

After processing, uncheck the results that you do not want to save.

If a single vector is checked, the detailed report displays when you click Report.

Observation

This displays the IDs of the "from" and "to" points in the baseline.

Solution type

Fixed - This denotes that the processor was able to resolve the integer ambiguity with enough confidence to select one set of integers over another.

Float - This denotes that the processor was unable to resolve the integer ambiguity with enough confidence to select one set of integers over another.

X/X - The numbers (Xs) denote the epochs processed/total epochs for the selected trajectories (roving segments).

Horizontal precision (95%)

Shows the horizontal precision of the observation.

Vertical
precision (95%)

Shows the vertical precision of the observation.

 

This denotes that the precision fell outside of the Flag acceptance criteria, as set in the Quality section of baseline processing settings.

This denotes that the precision fell outside of the Fail acceptance criteria.

RMS

This shows the quality of the solution as a root mean square, based solely on the measurement noise of the satellite ranging observations, independent of satellite geometry.

Length

This displays the distance between antenna phase centers for the processed vector.

Process/Stop/
Save

Click Process to initiate or resume baseline processing.

Click Stop to halt processing.

Click Save to close the dialog, compute the project, and display the processed vectors. The points update with the new coordinate values.

Cancel

Click this to close the dialog and clear the results.

Order

Click this to display the Processing Order dialog, where you can see the optimal processing order and change it if needed.

Report

Click this to display the Baseline Processing Report, which shows the processing results.

If a single vector is selected, the detailed report displays when you click Report.

Settings

Click this to display the Project Settings dialog, where you can change baseline processing settings.

Related topics

Process Baselines