To update joint details

When you perform joint mapping or during survey of the as-built pipeline, tap Details to update the details of the associated joint(s).

The ID of the joint is displayed in red if the joint has not yet been checked.

Tap Next and Prev to switch between the joint ahead and the joint behind.

Changes you make in this screen are used to update the tally file, and if you have made changes then the record is now marked as checked. Tap Store to save your changes.

The Details screen only allows you to edit details for joints that already exist in the tally file. You cannot use the Details screen to enter details for joint IDs that you have entered manually in the joint map file or when measuring a pipeline point and which do not exist in the tally file.

If you change the length of the joint ahead or the joint behind by more than the value set in the Minimum pup length field in the Pipeline options screen, the software prompts you to create a PUP joint definition. See To create a PUP joint.