To add a pipeline to the project

  1. Create the project in Trimble Sync Manager and open it. The Project overview screen appears.
  2. Click Properties next to the project name.
  3. Select the Pipelines tab in the lower left corner of the screen.

  4. To add the pipeline:
    1. Click New.
    2. In the Create Pipeline pop-up window, click Browse and browse to the location of the tally CSV file or drag it from File Explorer and drop it onto the Pipeline name field.

      One tally file is usually used as the master tally file for the entire pipeline project and shared amongst multiple survey crews. The name of the tally file is used as the Pipeline name.

      To prevent data conflicts, make sure that each pipeline has a unique name as Trimble Access uses a shared folder for all pipeline data.

    3. Select the column that identifies the unique joint ID.
    4. Click Create.
  5. Click Units to change the units and formats for numerical values. See Unit settings.
  6. Click Coord. sys. to choose the coordinate system for the job. To choose a coordinate system from the library.
    1. Click Define. The Coordinate system definition dialog appears.

    2. Select the Library tab.

      If you entered a location for the project in the Project properties screen, the map zooms to the defined location.

    3. If required, click in the map to pan and use click the slider below the map to change the zoom level.

      Appropriate coordinate systems for the map location are listed below the map.

    4. To ignore the map filter, disable the Map filtering switch.
    5. Select a coordinate system from the library list or use the Zone, Datum and Geoid fields to select the coordinate system settings.

    For more information on choosing a coordinate system for the job, including keying in parameters, see Coordinate system settings.

  7. Use the remaining fields in the Pipeline properties tab to configure the pipeline properties and add files related to the pipeline, such as the alignment, exclusion or pipeline cover files. See To configure Pipeline properties.
  8. Click Save to send the changes to Trimble Connect. If you have uploaded large files this can take a few minutes.

    The software returns to the Project overview screen.

  9. To see the new pipeline, tap near the top of the screen. The name of the pipeline you added appears above the list of jobs.

    The pipeline project is ready for the field crew to download.